top of page

Plan Documents

Upon completion of the schematic design and approval by the owner, John Fought Design (JFD) begins the process of developing a detailed set of construction documents that allows the owner to obtain the necessary approvals, bid the work with qualified contractors, and ultimately build the golf course.

​

The first step is to develop a new contour plan (grading) that allows us to develop ancillary plans such as clearing, drainage, cut and fill, grassing, and greens details. Along with these plans, JFD creates a construction manual, which contains a bid form, AIA general conditions, sample forms, and a customized set of technical specifications. These plans and documents are critical to the construction of the golf course. 

​

​

mgc_clearing_copy.jpg
mgc_grading.jpg
thumb_mgc-cutfill copy.jpg
PLAN COVER.jpg

 

​

All of the plan documents will be developed in an AutoCAD format so they can be integrated with the project land planner or civil engineer. 

bottom of page